Site
Sponsor

TXDOT Traffic Alert

By: Commissioner James Noack- Montgomery County Precinct Three
| Published 08/12/2022

Linkedin

THE WOODLANDS, TX -- I-45 at 1488:
Phase 1. IH 45 Southbound, all lanes, will be closed from Friday 8/12/22 at 9 pm until Monday 8/15/22 at 5 am.

Phase 2. IH 45 Southbound, all lanes, will be closed from Friday 8/19/22 at 9 pm until Monday 8/ 22/22 at 5 am.

This work will to be replacing the metal “finger joint” on the San Jacinto River Bridge before the FM 1488 Exit.
SB vehicles will be detoured off at Creighton Road to the 45 Feeder.

I-45 at Rayford Road
A secondary Closure will occur on IH 45 Southbound, all lanes at Rayford Road from Tuesday 8/16/22 at 9 pm to 8/17/22 at 5 am and if needed 8/17/22 9pm to 8/18/22 at 5 am.

This work will be night time work for a bridge repair.

Comments •
X
Log In to Comment